Why GHH? Ask Surveyor Calvin Weingart…

Meet Surveyor Calvin Weingart, P.L.S.

A Q & A with a 25 year veteran surveyor, Calvin finds passion and inspiration in his work and brings that to GHH’s clients on every project. 

How long have you worked at GHH?
I have worked here since June 15, 1998, so a little over 25 years.

What do you do and why do you do it?
I am a Professional Licensed Land Surveyor.  I do it because it is a good mix of outdoor physical activity and indoor intellectual activity.   I’ve been the Survey Manager at Godfrey Hoffman Hodge since 2015. I enjoy every aspect of the position from initial client contact to mission planning and execution to training and mentoring of survey technicians.

Why should someone seeking a survey contact GHH over your competitors?
I manage each job as I would want it managed if I was the client: consistent communication, performance to utmost ability, professionalism, patience. My goal is to minimize the chance the client will ask for an update.

What does a typical day look like for you?
I get in the office a little before 8 most days and review the plan of the day for our department.  I start mission briefs promptly at 8:00 and get the crew(s) ready to head out to the field.  If I am part of the field crew I gather files, gear and people and try to be out by 8:20 or so.  Between travel time and company hours there is only about 5 hours of onsite time so every minute counts in the morning.

If I am working in the office, I get the crew(s) launched out the door and start working on whatever task I have for myself that day.  This can range from survey computations, autocad drafting, land records research and quality review of completed surveys.  I have a dual mission in the form of staff and client support, so I am often switching from one function to another.

By about 2:30 or so I start thinking about the next day’s tasking to try and stay ahead of everyone so there is minimal down time and maximum efficiency.  By 3:30 the crew is usually back in, if they aren’t in already. They download the day’s data files and process all the info.  We attend to a few administrative chores such as time keeping and we wrap up at 4:30 with, hopefully, the next day planned out and all gear and files set to go.

What has changed during your career?
Technological advances in data collection, the availability of very accurate open-source data and municipal GIS.  All for the better or worse depending on your point of view.

What hasn’t changed?
The need for a professional surveyor’s expertise to verify measurements, the need to apply the rules of evidence and interpret boundary law and chopping line through dense brush on very hot days.

What’s the most interesting property you ever surveyed?
I  can’t name the exact property but I did get a chance to work in a very interesting location in the very heart of New Haven . Lets just say that we worked in spaces where some globally powerful people once socially  gathered in private.

What’s the hardest property you ever surveyed?
That is a subjective question! Some small parcels are very challenging with respect to forming a boundary opinion so the hard part is intellectual. On the other hand, some large parcels are physically demanding, such the 100 plus acres we surveyed in North Stonington.  I had two back to back days of walking 8 plus miles during one phase of the job. And there was the job this summer where we located and identified 612 trees.

What keeps you going back?
My job checks all the boxes for me: Physical work, intellectual work, technical expertise, mission planning, leadership, doing something that is a little offbeat that most people know a little about but not too much.  And finally, I am truly fortunate that I found a career in which you can start at the very bottom and work your way up to professional licensing through (I know this sounds quaint) hard work and dedication.

How Land Surveyors Set The Stage For A New Building

This Is How We Do It…

This sequential photo montage highlights all the phases involved in preparing a site for the construction of a new building.

  1.  The undeveloped, overgrown site in Hamden, CT at commencement of survey work.
  2.  Site conditions during field work with survey gear.  As we often do, our crew contends with towering, tangling vegetation.
  3.  A year later, after site design and the permitting process, the finished plan set is delivered to the town permitting agency.
  4.  The site is cleared and prepared for construction.
  5.  The crew and survey instrument are in position to locate and mark 384 points for Helical Pile installation.  (These piles, or piers, are used to stabilize soil to support the building foundation).
  6.  The pier stakeout is complete and the site is ready for the pile driving crew to commence work. Each location is identified by the  pink whisker flag and orange numerical identifier.

Once the piers are installed the foundation will be marked out for construction.

Stay tuned for updates as we follow this project to completion!

Building a Solid Foundation, One Form at a Time

Foundation Rising.

Building a solid foundation is a critical part of any construction project, and it requires careful planning and execution every step of the way. At GHH, we understand the importance of getting every detail right, from the initial site survey to the final construction stakeout. That’s why we’re proud to be part of a project that is now seeing the foundation rising, one form at a time. 

This project started with a site survey, which allowed us to gather important information about the site’s topography, existing structures, and potential obstacles. Based on the results of the survey, we were able to develop a site plan that met the client’s needs while also complying with all applicable regulations and zoning requirements. We then worked with the client to obtain the necessary permits, ensuring that the project could move forward. 

Now, with the foundation rising, we’re seeing the culmination of all that hard work. The concrete forms are being carefully placed and secured, ensuring that the foundation wall will be strong and stable for years to come. As the foundation takes shape, we’re reminded of the importance of attention to detail and precision in every aspect of the construction process. 

At GHH, we take pride in our ability to deliver high-quality surveying and civil engineering services that help our clients achieve their goals. Whether we’re surveying a site, developing a site plan, or providing construction stakeout services, we bring the same level of professionalism and expertise to every project. As we continue to work on this project and watch the foundation rise, we’re excited to see the results of our hard work and dedication taking shape.

Commonly Overlooked Factors When Assessing a Property

When selecting a prospective house or patch of land, most people are easily enticed by the usual factors like location, size, price and even structural design. But acquiring a property means that you need to be mindful of even the tiniest details. Otherwise, you might face unexpected conflicts or the value of your new property may be badly affected later on.

Continue reading “Commonly Overlooked Factors When Assessing a Property”

What is the Purpose of Preliminary Site Assessments?

site-assessmentPreliminary site assessments are undertaken to determine the most suitable land-use in terms of development and planning, or for construction purposes. This exercise is not only suited for large corporate projects, but also beneficial for individuals, especially those engaged in construction projects in urban areas where pressures on land are great. Furthermore, its best practice to include a section of environmental impact assessment of the proposed project when carrying out this exercise.

Continue reading “What is the Purpose of Preliminary Site Assessments?”