Project Spotlight: The Hamden Business Incubator

hamden business incubator

A project Godfrey-Hoffman Associates is currently part of is steadily moving forward.  The construction is nearly complete on the current phase of work at the future site of the Hamden Business Incubator. This phase includes the removal of old boilers and asbestos, as well as clearing out contaminated materials in the basement. The $200,000 for this phase came from the Federal Environmental Protection Agency (EPA) and the Hamden Economic Development Corporation (HEDC).

The Hamden Business Incubator is being developed by HEDC at the location of the former Newhall Community Center at 496 Newhall Street, which has been closed since 2002. The incubator will be serve as the location for up to 20 small businesses that specialize in service and technology areas such as light manufacturing, web design and medical office administration. The goal is develop affordable space for entrepreneurs to grow in Hamden to create jobs and increase tax revenue.

Continue reading “Project Spotlight: The Hamden Business Incubator”

Project Spotlight: Kensett Lane

6E Kensett Community 8 resized 600

Our very own Denise Halstead, PE, was hired by a developer to take an existing site of 15.87 acres, formerly the grounds of a gravel processing operation, consisting of 1.83 acres of wetlands and develop the site into an age-restricted community with a meeting center and pool. The development would have some 62 units, approximately 3,500 sf each with a garage and patio. This development would be the first new home community in Darien in more than a generation.

Challenges

6I Kensett Clubhouse 2 resized 600The plot of land was not without its challenges. The site had been overworked for 60 years and many drainage problems existed within the trunk storm sewer piping that ran throughout the entire property. A railroad and two cemeteries abutted the properties and the design be modified to appease all neighbors, regulatory agencies and the Town’s stormwater management requirements. The neighbors supported this development because the new design incorporated plans to alleviate flooding they regularly incurred during storm events.

The project required creative thinking in order to provide a home for a community that felt one with nature. One of the first improvements made was the replacement of the Town storm sewer and stormwater system. The use of underground systems combined with rain gardens and bioswales provided not just relief to the drainage concerns, but an environmentally sensitive and green infrastructure to complement the development.

6E Kensett Community 3 resized 600The project was unanimously approved in 2009, but hit a hurdle with the State of Connecticut Department of Transportation. The project planned to re-use the existing driveway to access the site. The State denied use of the entrance because it crossed the Metro North railroad tracks, a site of multiple fatalities. The developer had to put the job on hold and determine another way to access the site. With the railroad abutting the site on the west, cemeteries on the west and north and wetlands on the east, the only access was via a neighboring street, and involved the purchase of properties to do so.

In 2010, a solution was found, and with approval from local regulatory agencies and the state, an access drive was developed off Wakemore Street. Final design work would include permitting from Metro North for a sanitary sewer crossing under the railroard tracks, as well as a State Department of Transportation permit for improvements on the nearby Hoyt Street and the realignment of their access road, Wakemore Street. The project included extensive coordination with utility companies, the Town of Darien Public Works department, and general contractor, client, sub-contractors, and other specialty consultants.

Continue reading “Project Spotlight: Kensett Lane”

Project Spotlight: Kensett Lane

6E Kensett Community 8 resized 600

Our very own Denise Halstead, PE, was hired by a developer to take an existing site of 15.87 acres, formerly the grounds of a gravel processing operation, consisting of 1.83 acres of wetlands and develop the site into an age-restricted community with a meeting center and pool. The development would have some 62 units, approximately 3,500 sf each with a garage and patio. This development would be the first new home community in Darien in more than a generation.

Challenges

6I Kensett Clubhouse 2 resized 600

The plot of land was not without its challenges. The site had been overworked for 60 years and many drainage problems existed within the trunk storm sewer piping that ran throughout the entire property. A railroad and two cemeteries abutted the properties and the design be modified to appease all neighbors, regulatory agencies and the Town’s stormwater management requirements. The neighbors supported this development because the new design incorporated plans to alleviate flooding they regularly incurred during storm events.

The project required creative thinking in order to provide a home for a community that felt one with nature. One of the first improvements made was the replacement of the Town storm sewer and stormwater system. The use of underground systems combined with rain gardens and bioswales provided not just relief to the drainage concerns, but an environmentally sensitive and green infrastructure to complement the development.

6E Kensett Community 3 resized 600

The project was unanimously approved in 2009, but hit a hurdle with the State of Connecticut Department of Transportation. The project planned to re-use the existing driveway to access the site. The State denied use of the entrance because it crossed the Metro North railroad tracks, a site of multiple fatalities. The developer had to put the job on hold and determine another way to access the site. With the railroad abutting the site on the west, cemeteries on the west and north and wetlands on the east, the only access was via a neighboring street, and involved the purchase of properties to do so.

In 2010, a solution was found, and with approval from local regulatory agencies and the state, an access drive was developed off Wakemore Street. Final design work would include permitting from Metro North for a sanitary sewer crossing under the railroard tracks, as well as a State Department of Transportation permit for improvements on the nearby Hoyt Street and the realignment of their access road, Wakemore Street. The project included extensive coordination with utility companies, the Town of Darien Public Works department, and general contractor, client, sub-contractors, and other specialty consultants.

Looking Forward

Construction commenced in 2011 and is proceeding as planned. The project is a 3-year phased project, expected to be completed sometime this year in 2014. Kensett Lane Development is noted to have “filled a need for marketrate homes that are different from the single-family residences available in Darien.” Town officials stated that the development provides a long-needed option for many older, longer-term residents of Darien looking to downscale while maintaining their connectivity to the town and providing bedrooms for visiting family.

6I Kensett Clubhouse 8 resized 600

The Role of a Civil Engineer in a Commercial Project

Role of Civil Engineer in Commercial ProjectA civil engineer is responsible for many facets of a project, such as designing, planning, managing, and creating reports on construction jobs. These responsibilities are even more important when it comes to commercial projects.

The responsibilities of a civil engineer increase extensively when working on a commercial project. They take on a more hands-on role in developing and making sure that the job is done safely and accurately. Commercial construction projects are more complicated and require a more planned and detailed approach.

Continue reading “The Role of a Civil Engineer in a Commercial Project”

Civil Engineering in Connecticut

Civil EngineeringEverywhere we look, we can see magnificent infrastructures like tall buildings, huge dams, and sturdy bridges. We rely on these structures to supply us with clean water, energy, shelter, and even ways to recycle our waste and lessen pollution. All of these benefits that we receive everyday are created through the expertise of Civil Engineering.

Civil Engineering firms in Connecticut, such as Godfrey-Hoffman & Hodge, devote their time and energy to create these wonderful structures to help us live life as comfortably and conveniently as we can.

Continue reading “Civil Engineering in Connecticut”